General project information for each project can be found on the Information page.

  1. Phase 1D-2A-Route 137 - Morton Road Sewer Extension Project (contract 2019-cwmp-1)

1D-2A Service Area (for Web) Opens in new windowPhase 1D-2A-Route 137 - Morton Road Sewer Extension Project

Gravity and Pressure Sewer Areas

This project is being funded under the Massachusetts Clean Water State Revolving Fund Program (CWSRF #4516) and USEPA. 

General Contractor: C.C. Construction, Inc.

Contract Bid Price: $8,478,406.60

As sewer installation is completed, contractor will be installing lateral services and following this work these areas may still require site restoration, final paving and cleanup.

  • Mill Hill Road
  • Morton Road (from Tirrells Way to the Bike Path)
  • Meetinghouse Road/Rt 137 (from Route 28/Main Street to Stage Coach Drive)
  • Middle Road (from Meetinghouse Road to the Water Pollution Control Facility (WPCF) rear entrance)
  • Twine Field
  • The Bike Path (between Morton Road and the WPCF)

Temporary water services may be required on these and other street depending on utility conflicts.  In addition there may be water service replacements made on these or other roads identified for sewer work to replace old steel services.

  1. Queen anne pumping station upgrade project (Contract 2021-cwmp-1)
  1. crowell road phase 2 and chatham fish pier infrastructure project (contract 2021-cwmp-2)
  1. Completed - Phase 1E-Stony Hill/ CROWELL ROAD INFRASTRUCTURE PROJECT (CONTRACT 2019-CWMP-3) 
  1. Completed - Phase 1D-1 (Contract 2018-cwmp-4) - chatham - harwich regionalization connection project
  1. completed - Phase 1C-3&4 (Contract 2018-CWMP-2) - Oyster pond sewer extension